Alert! Chief Minister Maryam Nawaz has launched a groundbreaking opportunity for Punjab’s farmers: the 2026 Solar Tubewell Scheme, offering an 80% government subsidy to completely transform your irrigation costs. With the deadline of 31st January 2026 fast approaching, this is your final chance to secure a solar system and slash your diesel bills by up to Rs. 200,000 annually. Don’t miss this historic shift from costly fuel to free solar power for your fields.
Farming in Punjab is about to get more profitable and sustainable. The Punjab Government’s 2026 Solar Tubewell Scheme is a direct response to the crippling cost of diesel and electricity. By distributing 8,000 solar-powered tubewell systems with massive financial support, the scheme aims to empower small and medium farmers. This guide covers every step – from eligibility to the online application process.
What is the Punjab Solar Tubewell Scheme 2026?
This is a flagship initiative by the Government of Punjab, providing farmers with subsidized solar tubewell systems. The core offer is simple:
- The government pays 80% of the total system cost.
- The farmer pays only the remaining 20%.
- It includes the installation of solar panels, a pump, and all necessary equipment.
- The goal is to provide free solar energy for irrigation, reducing dependency on the grid and diesel.
Am I Eligible for the Punjab Solar Tubewell Scheme?
To qualify for this scheme, you must meet the following conditions:
- You must be a resident farmer of Punjab with a valid CNIC.
- You must own at least 1 acre of cultivable land (verified by Fard/Maktab).
- Your existing tubewell must be functional.
- You should not have received a solar tubewell subsidy from any government scheme in the past.
- Tenant farmers are also eligible with a verified 11-month lease agreement.
What is the Subsidy Amount and Savings?
The subsidy is substantial. Here is a breakdown of the costs and savings for different system capacities:
| System Capacity | Total Estimated Cost | Govt. Subsidy (80%) | Farmer’s Share (20%) |
|---|---|---|---|
| 10 HP System | PKR 500,000 | PKR 400,000 | PKR 100,000 |
| 15 HP System | PKR 750,000 | PKR 600,000 | PKR 150,000 |
| 20 HP System | PKR 1,000,000 | PKR 800,000 | PKR 200,000 |
Annual Savings: Farmers can save approximately PKR 200,000 to 400,000 per year on diesel costs, making the initial 20% investment highly worthwhile.
How to Apply Online for Punjab Solar Tubewell Scheme? (Step-by-Step Process)
The entire application process is online to ensure transparency and ease. Follow these steps:
- Visit the Official Portal: Go to the Punjab Agriculture Department website: https://agriculture.punjab.gov.pk.
- Find the Scheme Link: Navigate to the “Punjab Solar Tubewell Scheme 2026” section on the homepage.
- Click on ‘Apply Online’: Start a new application form.
- Fill in the Details: Enter your personal information, CNIC number, land details, and contact information accurately.
- Upload Required Documents: Scan and upload clear copies of your CNIC, Land Ownership Fard (Khasra/Girdawari), and a photo of your existing tubewell.
- Review and Submit: Double-check all entries and submit the form. Note down your application tracking ID.
What is the Last Date and Selection Process?
- Last Date to Apply: 31st January 2026. Applications will not be accepted after this date for the current phase.
- Selection Process: After submission, your application will be verified by the local agriculture department. A lottery or merit-based system will be used to select beneficiaries from eligible applicants due to high demand.
- How to Check Status: You can check your application status online using your CNIC number or tracking ID on the same portal. An SMS will also be sent if you are selected.
What are the Required Documents?
Keep these documents ready before starting your online application:
- Farmer’s Computerized National Identity Card (CNIC)
- Land Ownership Documents (Fard, Khasra/Girdawri)
- Recent photograph of the existing functional tubewell
- Bank account details for subsidy transfer
- For Tenant Farmers: 11-month lease agreement with Patwari verification stamp.
FAQs
Q1: Can I apply if I have less than 1 acre of land?
A1: No. The minimum land requirement is 1 acre of cultivable land to be eligible for the scheme.
Q2: How will I receive the 80% subsidy amount?
A2: The subsidy will be directly transferred to the vendor/installer approved by the government. The farmer only pays their 20% share to the vendor.
Q3: Is there any maintenance cost?
A3: Basic annual maintenance (cleaning, minor checks) may cost between PKR 6,000 to 10,000. The solar panels come with a 25-year performance warranty.
Q4: What if I miss the 31st January deadline?
A4: You will have to wait for the announcement of Phase 2 of the scheme, which is not guaranteed. It is best to apply in the current phase.
Q5: Where can I get help for the application?
A5: You can visit your nearest Punjab Agriculture Department office or call their helpline for guidance on the online application process.
Conclusion
The Punjab Solar Tubewell Scheme 2026 is a transformative project that directly addresses farmer profitability. By switching to solar, you lock in decades of free irrigation power, protecting yourself from rising fuel prices. The process is simple, transparent, and online. Do not wait until the last day. Visit the official portal now, check your eligibility, and submit your application before 31st January 2026 to secure your future.